Hyde Park Islands Tree Removal
Hyde Park Islands — Large-Scale Environmentally Sensitive Removal
Client: DPIRD and City of Vincent · Location: Hyde Park, Highgate · Scope: Crane-assisted tree removal across two park islands
Hyde Park’s two islands presented one of the most logistically complex jobs we’ve undertaken — complete removal of designated trees across both islands with zero disturbance to the waterway, delivered over just under five weeks in May–June 2025.
The project used a 250-tonne crane, tracked EWPs, an articulated mini loader and multiple chipper crews, with personnel and equipment moved on and off the islands using ground protection matting, temporary access boards, and a man cage when rising water made board crossings unsafe. Roughly 200 bulk bags of topsoil were craned in to dress the stumps after removal.
Weeks of pre-planning — including underground services scans, a geotechnical survey, and coordination with a crane lift supervisor — meant the team could adapt when conditions changed mid-project, including a methodology revision to work around an underground gas main and an overhead power line that had to be de-energised before crane operations could begin.
- Approximately 440 tonnes of tree material processed and removed from site
- Zero safety incidents across the full project
- Positive feedback from the City of Vincent, BAM officers and local residents
- No evidence of disturbance to active wildlife nests throughout the works



Discuss your tree project